close
close

Road and rail updates for Cambridgeshire at the start of June

Road and rail updates for Cambridgeshire at the start of June

Wulfstan Way – Cambridge 

The road is closed to all motor vehicles until June 2 between 9.30am and 2.30pm daily for works. 

Govia Thameslink Railway – industrial action on June 2 and June 3. No service on June 2. Services will also be impacted until around 7am on Sunday June 4 following the strike. 

On Friday June 2, due to strike action by the RMT union, services will be limited across the network, with a later start, an early shut down and no service in some locations. 

Gatwick Express will not run between June 2 and June 3, but the airport will continue to be served by Southern and Thameslink on the days train services are operating. 

Passengers are advised to check their journeys in advance at www.nationalrail.co.uk. 

B1104 Station Road/Isleham Road – Chippenham   

The road will be closed to all motor vehicles for one day between May 25 and June 2 for surface dressing works from 9.30am until 3.30pm. These works are weather dependent and are subject to change. 

St Mary’s Street – Farcet  

The road will be closed both ways to all motor vehicles between May 31 and June 2 due to works by Anglian Water. 

Cock Bank – Whittlesey 

The road will be closed to all motor vehicles for one day between June 1-7 for surface dressing works. 

The Street – Diddington 

The road will be closed to all motor vehicles for one day between June 1-8 for surface dressing works. 

High Street – Cambridge   

The road will be closed both ways to all motor vehicles until June 2 due to works by Cambridge Water.   

See also  The Bury cafe selling raw cookie dough loaded with American cereal and ice cream

B1043 Alconbury 

The road will be closed to all motor vehicles for one day between June 2-12 for surface dressing works.

Coneygear Road – Huntingdon   

The road will be closed both ways to all motor vehicles until June 2 due to works by Anglian Water.   

Globe Lane – Alconbury   

The road will be closed both ways to all motor vehicles until June 2 for works. 

High Street – Ellington 

The road will be closed to all motor vehicles for two days between June 2-9 for grip fibre works. 

Ermine Street – Great Stukeley 

The road will be closed to all motor vehicles for one day between June 2-12 for surface dressing works. 

A603 East Road – Cambridge 

The road will be closed to all motor vehicles until June 5, between 8pm and 5am nightly, due to works by Anglian Water. 

B1050 Hattons Road – Longstanton   

The road will be closed both ways to all motor vehicles for two days between May 25 and June 7 for surface dressing works from 8am until 6pm daily. These works are weather dependent and subject to change. 

Over Road – Willingham   

The road will be closed both ways to all motor vehicles until July 7 due to works by Cambridge Water. 

Milking Slade Lane – Great Gidding   

Closed both ways to all traffic until August 6 between 7am and 5pm due to works by the National Grid. 

  • June 2, 2023